Customization: | Available |
---|---|
After-sales Service: | After-Sales Service |
Warranty: | 1 Year |
Still deciding? Get samples of US$ 0.1/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Trico Factory Price Formwork Accessories Form Tie System
B Form Tie for Formwork Construction
The Form Tie System prevents breakage in the formwork, thus keeping concrete structures
in good shape without discoloration.
Besides the ease of assembly and removal, the system saves construction costs as all parts
are reusable except for the separator which is cast into the wall.
Form Tie Complets Set Requirements:
The Form Tie System consists of Form Tie 2pcs, Inner Unit 1pc, Plastic Cone 2pcs,Rib
washers 2pcs, and Hex Nut 2pcs.
B Form Tie System
The Form Tie System B Type consists of B Form Tie 2pcs, B Inner Unit 1pc, B Cone 2pcs,
Rib washers 2pcs, and Hex Nut 2pcs.
B Form Tie | B Inner Unit | Plastic B Cone | Rib Washer | Hex nut | |
Photo | |||||
Diameter | 1/2" | B9,3/8" | 3/8" |
2.5mm/3.0mm Thickness |
1/2" |
Length /size |
180mm,200mm 210mm,250mm |
Different Sizes available |
B9*12,B9*16, B9*24 |
Different sizes available |
/ |
Weight |
145g,160g, 168g,197g |
Up to Sizes | 35g,38g,45g | Up to Sizes | 20.5g |
Finishing | Glalvanizing | Self color | Galvanizing | Galvanizing or in Black Item Name |
Galvanizing or in black |
Packing | 100pcs/carton | 50pcs/bundle | 400pcs/carton | 100pcs/carton; 100pc/small bag |
1000pcs/carton |
D Form Tie System
The D Form Tie System has been used on a vast scale in concrete construction to assemble
temporary formwork.
Form Tie Complete Set Requirements:
The Form Tie System D Type consists of D Form Tie 2pcs,D Inner Unit 1pc, Plastic D Cone
2pcs, Rib washers 2pcs and Hex Nut 2pcs.
D Form Tie System | ||||
Picture | Name | Length | Size | Packaging |
|
D form tie |
150mm,180mm,210mm,250mm Other Sizes Available |
1/2" | Bundle+Pallet |
|
D Cone | 40mm | 1/2" | Carton+Pallet |
50mm | 1/2" | |||
|
Inner Unit | According to Wall Thickness | 1/2" | Bundle+Pallet |
|
3 Shape Washer | 115mm | / | Bag+Pallet |
Flat Rib Washer | 100x50x2.5mm | / |
Item No. | Product Name | Packing |
1 | D Form Tie | 50pcs/Bundle |
2 | D Inner Unit | 50pcs/Bundle |
3 | B Form Tie | 100pcs/Carton Box |
4 | B Inner Unit | 50pcs/Bundle |
5 | Plastic D Cone | 200pcs/Carton Box |
6 | Plastic B Cone | 400pcs/Carton Box |
7 | Flat Rib Washer 50*100mm | 200pcs/Bag |
8 | Flat Rib Washer 50*150mm | 100pcs/Bag |
9 | 3 Shape Washer | 100pcs/Bag |
10 | Rubber Ring | 1000pcs/Bag |
11 | Hex Nut 1/2" | 1000pcs/Carton Box |
The Concrete Formwork Tie Rod System is used with various formwork accessories in
concrete construction. This system includes Tie Rods, Formwork Wing Nuts, Concrete Anchor
Nuts, Hex Nuts, Connection Nuts, etc.
Formwork accessories Spring wedge clamps, Formwork Rapid Clamps,
and Rapid Tensioners.
TRICO was founded in 2002. As an expert in the field of formwork and scaffolding, TRICO is
committed to providing better products and services to customers in the global construction
industry.TRICO has a wide range of product lines, including the production and supply of full
system of building formwork, scaffolding and related components, and has realized the "1+N"
one-stop service mode. The products sell well in more than 90 countries and regions, winning
the recognition and trust of business partners around the world. TRICO's R&D team is
experimenting and optimizing products every day. The endless improvement and perfection
is the gene of TRICO culture. TRICO's mission is to promote the quality improvement, cost
reduction and environmental protection and efficiency enhancement of global buildings.
Let's work together to make it easier to build houses anywhere in the world!
TRICO Supplying Now:
· Formwork Tie Rod System
· Aluminium Formwork Wall Tie System
· Scaffolding System
· PP Hollow Plastic Formwork
· Steel Formwork Panel with Plywood Forming System
· Other Plastic Building Materials
1. Quality: Strictly control the quality through three levels. First level, quality test on the
producing line. Second level, the quality test during warehousing. Third level, quality test
before loading.
2. Timeliness: 24 hours online.Provide consulting and quotation services for customers
all the time.
3. Veracity: Strictly follow the customer standard to ensure the tolerance range and meet
customer's requirement.
4. Integrity: If The customer complains about the quality of the products, our company will
actively cooperate with them to solve the problem. If it is the responsibility of our company,
we will bear the corresponding responsibility and compensation.
5. Longevity: Establish good long-term relationship with customers.