Customization: | Available |
---|---|
After-sales Service: | After-Sales Service |
Warranty: | 1 Year |
Still deciding? Get samples of US$ 0.1/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Competitive Price Form Tie System D Form Tie Formwork Plastic D Cone
The Form Tie System prevents breakage in the formwork, thus keeping concrete structures
in good shape without discoloration.
Besides the ease of assembly and removal, the system saves construction costs as all parts
are reusable except for the separator which is cast into the wall.
Form Tie Complets Set Requirements:
The Form Tie System consists of Form Tie 2pcs, Inner Unit 1pc, Plastic Cone 2pcs,Rib
washers 2pcs, and Hex Nut 2pcs.
D Form Tie System
The D Form Tie System has been used on a vast scale in concrete construction to assemble
temporary formwork.
Form Tie Complete Set Requirements:
The Form Tie System D Type consists of D Form Tie 2pcs,D Inner Unit 1pc, Plastic D Cone
2pcs, Rib washers 2pcs and Hex Nut 2pcs.
D Form Tie System | ||||
Picture | Name | Length | Size | Packaging |
|
D form tie |
150mm,180mm,210mm,250mm Other Sizes Available |
1/2" | Bundle+Pallet |
|
D Cone | 40mm | 1/2" | Carton+Pallet |
50mm | 1/2" | |||
|
Inner Unit | According to Wall Thickness | 1/2" | Bundle+Pallet |
|
3 Shape Washer | 115mm | / | Bag+Pallet |
Flat Rib Washer | 100x50x2.5mm | / |
B Form Tie System
The Form Tie System B Type consists of B Form Tie 2pcs, B Inner Unit 1pc, B Cone 2pcs,
Rib washers 2pcs, and Hex Nut 2pcs.
B Form Tie | B Inner Unit | Plastic B Cone | Rib Washer | Hex nut | |
Photo | |||||
Diameter | 1/2" | B9,3/8" | 3/8" |
2.5mm/3.0mm Thickness |
1/2" |
Length /size |
180mm,200mm 210mm,250mm |
Different Sizes available |
B9*12,B9*16, B9*24 |
Different sizes available |
/ |
Weight |
145g,160g, 168g,197g |
Up to Sizes | 35g,38g,45g | Up to Sizes | 20.5g |
Finishing | Glalvanizing | Self color | Galvanizing | Galvanizing or in Black Item Name |
Galvanizing or in black |
Packing | 100pcs/carton | 50pcs/bundle | 400pcs/carton | 100pcs/carton; 100pc/small bag |
1000pcs/carton |
The Concrete Formwork Tie Rod System is used with various formwork accessories in
concrete construction. This system includes Tie Rods, Formwork Wing Nuts, Concrete Anchor
Nuts, Hex Nuts, Connection Nuts, etc.
Formwork accessories Spring wedge clamps, Formwork Rapid Clamps,
and Rapid Tensioners.
1. Quality: Strictly control the quality through three levels. First level, quality test on the producing line.
Second level, quality test during warehousing. Third level, quality test before loading.
2. Timeliness: 24 hours online. Provide consulting and quotation services for customers all the time.
3. Veracity: Strictly follow the customer standard to ensure the tolerance range and meet customer's
requirement.
4. Integrity: If the customer complains about the quality of the products, our company will actively
cooperate with them to solve the problem. If it is the responsibility of our company, we will bear the
corresponding responsibility and compensation.
5. Longevity: Establish good long-term relationship with customers.
TRICO was founded in 2002. As an expert in the field of formwork and scaffolding, TRICO is
committed to providing better products and services to customers in the global construction
industry.TRICO has a wide range of product lines, including the production and supply of full
system of building formwork, scaffolding and related components, and has realized the "1+N"
one-stop service mode. The products sell well in more than 90 countries and regions, winning
the recognition and trust of business partners around the world. TRICO's R&D team is
experimenting and optimizing products every day. The endless improvement and perfection
is the gene of TRICO culture. TRICO's mission is to promote the quality improvement, cost
reduction and environmental protection and efficiency enhancement of global buildings.
Let's work together to make it easier to build houses anywhere in the world!