Aluminum Formwork Concrete Stub Pin Al Flat Tie

Product Details
Customization: Available
After-sales Service: Onliine Technique Support
Warranty: Online Technique Support
Still deciding? Get samples of US$ 1/Piece
Request Sample
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2023

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Fast Delivery
The supplier can deliver the goods within 30 days
100% Finished Products Inspection
The supplier inspects 100% of finished products.
Production Process Visualization
You can check the supplier's production workflow chart or main facilities in the Audit Report
to see all verified strength labels (22)
  • Aluminum Formwork Concrete Stub Pin Al Flat Tie
  • Aluminum Formwork Concrete Stub Pin Al Flat Tie
  • Aluminum Formwork Concrete Stub Pin Al Flat Tie
  • Aluminum Formwork Concrete Stub Pin Al Flat Tie
  • Aluminum Formwork Concrete Stub Pin Al Flat Tie
  • Aluminum Formwork Concrete Stub Pin Al Flat Tie
Find Similar Products
  • Overview
  • Product Description
  • Packaging & Shipping
  • More Products
  • Our Service
  • Company Profile
Overview

Basic Info.

Model NO.
D218
Certification
SGS
Material
50mn
Type
Concrete Formwork Wedge Pin
Product Name
Flat Tie
Surface Treatment
as Nature
Application
Formwork Forming
MOQ
1000PCS
Other Accessories
Wedge & Pin
Thickness
1.85mm,1.9mm,2.0mm,etc.
Transport Package
Pallet
Specification
100-800mm
Trademark
TRICO
Origin
China
HS Code
73291990
Production Capacity
500tons/Month

Product Description

Product Description

Aluminum Formwork Concrete Stub Pin AL Flat Tie 
Aluminum Formwork Wall Tie is used for Aluminum Formwork System. Wall Tie is fit for different wall
thickness. The tie is uesd to lock aluminum formwork panel during wall concrete formwork.

Picture Name Size(mm) Weight(g) Material Packing(PCS/PLT) Pallet/20GP
Aluminum Formwork Concrete Stub Pin Al Flat Tie AL Flat Tie 100 63 50Mn 22000 13
150 95 20000 13
200 100 18000 13
300 111 15000 13
400 141 10000 13
500 179 8000 13
600 224 7000 13
700 269 5000 13
800 316 5000 13

 

Picture Name

Length(mm)

Weight(g)

Surface Material Packing
Aluminum Formwork Concrete Stub Pin Al Flat Tie  Formwork  Stub Pin 52 Solid 63 Self -color/ Galvanized

Q195/Q235

Woven bag
Half hollow 53
Hollow 50
54 67
65 85
75 96
130 192
195 282

 

Picture Name Length(mm) Thickness(mm) Surface Material Packing
Aluminum Formwork Concrete Stub Pin Al Flat Tie Wedge 70 2.5/3.0mm Self-color/ Galvanized

Q235/15#steel

/45#steel/16Mn

Woven bag
Picture Name Size(mm) Thickness(mm) Weight(g) Surface Material Pakcing
Aluminum Formwork Concrete Stub Pin Al Flat Tie Waller clamp 50 4.0 530 Galvanized Carbon Steel Woven bag
5.0 610
60 4.5 600

5.0
 
630

 

Aluminum Formwork Concrete Stub Pin Al Flat Tie

 

Aluminum Formwork Concrete Stub Pin Al Flat Tie

Aluminum Formwork Concrete Stub Pin Al Flat Tie

 

Aluminum Formwork Concrete Stub Pin Al Flat TieAluminum Formwork Concrete Stub Pin Al Flat Tie

 

Packaging & Shipping

Aluminum Formwork Concrete Stub Pin Al Flat Tie
Aluminum Formwork Concrete Stub Pin Al Flat Tie
Aluminum Formwork Concrete Stub Pin Al Flat Tie

More Products

Formwork Tie Rod System

The Formwork Tie Rod system components include the Tie Rod, Wing Nut, Tie Nut, Anchor Nut, Water Barrier
/Water Stop, Washer Plate/Waller Plate, Steel Cone, Plastic Tube and Cone
 and 
some European countries also
asked for the Flupp Plug ( Rubber Stop).

Wing nuts and Tie rods as a whole facility are used widely in formwork construction.

Aluminum Formwork Concrete Stub Pin Al Flat Tie
Adjustable Steel Prop/Prop Sleeve/Prop Nut

1. A complete set of steel prop consists of Top Plate, Base Plate,Inner pipe,Outer pipe, Prop Sleeve, Prop Nut
and G Pin.

2.The steel prop is easy to assemble and disassemble due to its simple structure.
3. Can be adjusted to any length within its range;it can be reused.
4. Widely used in proping system such as construction,plants and bridge etc.
Aluminum Formwork Concrete Stub Pin Al Flat Tie

Our Service

TRICO offering the products:

1. Quality: Strictly control the quality through three levels. First level, quality test on the producing line.
Second level, quality test during warehousing. Third level, quality test before loading.

2. Timeliness: 24 hours online. Provide consulting and quotation services for customers all the time.

3. Veracity: Strictly follow the customer standard to ensure the tolerance range and meet customer's
requirement.

4. Integrity: If the customer complains about the quality of the products, our company will actively
cooperate with them to solve the problem. If it is the responsibility of our company, we will bear the
corresponding responsibility and compensation.

5. Longevity: Establish good long-term relationship with customers.

Company Profile

TRICO was founded in 2002. As an expert in the field of formwork and scaffolding, TRICO is
committed to providing better products and services to customers in the global construction industry.

TRICO has a wide range of product lines, including the production and supply of full system
of building formwork, scaffolding and related components, and has realized the "1+N" one-stop
service mode. The products sell well in more than 90 countries and regions, winning the recognition
and trust of business partners around the world.


TRICO's R&D team is experimenting and optimizing products every day. The endless
improvement and perfection is the gene of TRICO culture. TRICO's mission is to promote the
quality improvement,cost reduction and environmental protection and efficiency enhancement
of global buildings. 
Let's work together to make it easier to build houses anywhere in the world!

Aluminum Formwork Concrete Stub Pin Al Flat TieAluminum Formwork Concrete Stub Pin Al Flat Tie
Aluminum Formwork Concrete Stub Pin Al Flat TieAluminum Formwork Concrete Stub Pin Al Flat Tie
Aluminum Formwork Concrete Stub Pin Al Flat Tie

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier