• Hebei Trico Concrete Formwork Tie Rod System Formwork Water Stopper for Construction
  • Hebei Trico Concrete Formwork Tie Rod System Formwork Water Stopper for Construction
  • Hebei Trico Concrete Formwork Tie Rod System Formwork Water Stopper for Construction
  • Hebei Trico Concrete Formwork Tie Rod System Formwork Water Stopper for Construction
  • Hebei Trico Concrete Formwork Tie Rod System Formwork Water Stopper for Construction
  • Hebei Trico Concrete Formwork Tie Rod System Formwork Water Stopper for Construction

Hebei Trico Concrete Formwork Tie Rod System Formwork Water Stopper for Construction

After-sales Service: Yes
Warranty: 1 Year
Certification: SGS
Material: Ductile Cast Iron
Type: Wall Formwork
Application: Building Construction
Samples:
US$ 1/Piece 1 Piece(Min.Order)
| Request Sample
Customization:

360° Virtual Tour

Diamond Member Since 2023

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
  • Overview
  • Product Description
  • Related Products
  • Packaging & Shipping
  • More Products
  • Our Services
  • Company Information
  • Contact Information
Overview

Basic Info.

Model NO.
TR005
Surface
Self Color or Galvanized
Advantage
High Tension
Tensile Force
180kn
Transport Package
Woven Bag
Specification
440g, 500g
Trademark
TRICO
Origin
Hebei, China
Production Capacity
500tons/Month

Product Description

Product Description

Hebei TRICO Concrete Formwork Tie Rod System Formwork Water
Stopper For Construction

 

Water Stop for Steel Tie Rod

The Water Stop/Water Barrier Nut is used to provide a water tight seal between the two sides of a concrete
wall. It is used in conjuction with 15m diameter Formwork Tie Rod, Polythene Cones, PVC Tube Spacers,
and Water Barrier Sleeves to allow recovery of the formwork tie rods.

Item Name Photo Material Diameter Weight Finishing Breaking Load
Water Stop Hebei Trico Concrete Formwork Tie Rod System Formwork Water Stopper for Construction Cast Iron D12 / Self color or galvanzing /
Cast Iron D15

440g

450g

500g

Self color or galvanzing 180KN
Cast Iron D20

1.0kg

1.2kg

Self color or galvanzing 320KN
Product name Photos Diameter Weight Length Finishing
Steel tie Rod(Cold rolled) Hebei Trico Concrete Formwork Tie Rod System Formwork Water Stopper for Construction D12 0.75kg/m 1m,1.2m,1.5m,3m,5.8m,6m or cutting as your requirement Self color or galvanizing
D15 1.5kg/m
D20 2.5kg/m
Hot rolled tie rod Hebei Trico Concrete Formwork Tie Rod System Formwork Water Stopper for Construction D15 1.47kg/m
Picture Item

Specifications

Weight

Material Feature

Packaging

Hebei Trico Concrete Formwork Tie Rod System Formwork Water Stopper for Construction Two Arms Wing Nut

Diameter:

10/12mm

15/17mm

20/22mm

180g

300g

350g

400g

520g

620g

Ductile Iron  Breaking Load 180Kn

Ton Bag /Pallet

 

Other Demand

Suport

Hebei Trico Concrete Formwork Tie Rod System Formwork Water Stopper for Construction One Arm Wing Nut

Diameter:

15/17mm

 

 340g Ductile Iron  Breaking Load 180Kn  

Ton Bag /Pallet

 

Other Demand

Suport


Hebei Trico Concrete Formwork Tie Rod System Formwork Water Stopper for Construction
 Anchor Nut

 Diameter:

10/12mm

15/17mm

20/22mm

350g

440g

500g

530g

560g

600g

820g

960g

1000g

Ductile Iron  Breaking Load 180Kn  

Ton Bag /Pallet

 

Other Demand

Suport

Hebei Trico Concrete Formwork Tie Rod System Formwork Water Stopper for Construction Tie Nut

Diameter:

15/17mm

20/22mm

600g

870g

1100g

Forged Breaking Load 200Kn

Ton Bag /Pallet

 

Other Demand

Suport

Hebei Trico Concrete Formwork Tie Rod System Formwork Water Stopper for Construction Swivel Wing Nut

Diameter:

15/17mm

1.1kgs

1.3kgs

Ductile Iron Breaking Load 180Kn

Ton Bag /Pallet

 

Other Demand

Suport

Hebei Trico Concrete Formwork Tie Rod System Formwork Water Stopper for Construction Water Stop

Diameter:

15/17mm

20/22mm

440g

500g

900g

1200g

Ductile Iron Breaking Load 180Kn

Ton Bag /Pallet

 

Other Demand

Suport

Hebei Trico Concrete Formwork Tie Rod System Formwork Water Stopper for Construction Steel Cone

Diameter:

15/17mm

Length-75mm

Length-100mm

Ductile Iron Breaking Load 180Kn Woven Bag/Carton with Pallet
Hebei Trico Concrete Formwork Tie Rod System Formwork Water Stopper for Construction Washer Plate

100*125mm

120*120mm

100*130mm

 

Different Thickness are Available

Carbon Steel /

Ton Bag /Pallet

 

Other Demand

Suport

Hebei Trico Concrete Formwork Tie Rod System Formwork Water Stopper for Construction
Hebei Trico Concrete Formwork Tie Rod System Formwork Water Stopper for Construction
Hebei Trico Concrete Formwork Tie Rod System Formwork Water Stopper for Construction
Related Products

Hebei Trico Concrete Formwork Tie Rod System Formwork Water Stopper for ConstructionHebei Trico Concrete Formwork Tie Rod System Formwork Water Stopper for Construction
Hebei Trico Concrete Formwork Tie Rod System Formwork Water Stopper for Construction

Packaging & Shipping
Hebei Trico Concrete Formwork Tie Rod System Formwork Water Stopper for Construction
More Products

TRICO Hollow Plastic Formwork is designed to replace the traditional
Plywood with the advantages of:

1.REUSE 80-100 times,no need oil.

2.100% Waterproof

3.Can cut, nail and screw

4.Save 30% total budget than plywood and metal formworkHebei Trico Concrete Formwork Tie Rod System Formwork Water Stopper for Construction
Formwork Clamp is a high-strength concrete forming system designed for fast-paced gangform
operations. It has the strength required for the large contact areas and fast pour rates common
in large gangform applications. We have carbon steel spring clamp and spring clamp tensioner,
ductile cast iron wedge clamp and weged clamp tensioner. Formwork Clamps fit for 6-10mm or
8-12mm steel rebar.
Hebei Trico Concrete Formwork Tie Rod System Formwork Water Stopper for Construction

Our Services

TRICO offering the products:

1. Quality: Strictly control the quality through three levels. First level, quality test on the producing line.
Second level, quality test during warehousing. Third level, quality test before loading.

2. Timeliness: 24 hours online. Provide consulting and quotation services for customers all the time.

3. Veracity: Strictly follow the customer standard to ensure the tolerance range and meet customer's
requirement.

4. Integrity: If the customer complains about the quality of the products, our company will actively
cooperate with them to solve the problem. If it is the responsibility of our company, we will bear the
corresponding responsibility and compensation.

5. Longevity: Establish good long-term relationship with customers.

Company Information

TRICO was founded in 2002. As an expert in the field of formwork and scaffolding,
TRICOis committed to providing better products and services to customers in the global
construction industry.

TRICO has a wide range of product lines, including the production and supply of full
system of building formwork, scaffolding and related components, and has realized
the "1+N" one-stop service mode. Theproducts sell well in more than 90 countries
and regions, winning the recognition and trust of business partners around the world.

TRICO's R&D team is experimenting and optimizing products every day. The endless
improvement and perfection is the gene of TRICO culture. TRICO's mission is to promote
the quality improvement, cost reduction and environmental protection and efficiency
enhancement of global buildings. 

Let's work together to make it easier to build houses anywhere in the world!Hebei Trico Concrete Formwork Tie Rod System Formwork Water Stopper for ConstructionHebei Trico Concrete Formwork Tie Rod System Formwork Water Stopper for Construction

Hebei Trico Concrete Formwork Tie Rod System Formwork Water Stopper for ConstructionHebei Trico Concrete Formwork Tie Rod System Formwork Water Stopper for Construction
Hebei Trico Concrete Formwork Tie Rod System Formwork Water Stopper for Construction

Contact Information

Hebei Trico Trade Co., Ltd

(Shijiazhuang Trico Hardware Products Co.,Ltd)

Add: Room 1005, Zhongyuan Building, No. 368 Youyi St., Shijiazhuang, Hebei, China.

 

 

Attn: Victor Lu (Sales Manager)

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

360° Virtual Tour

Diamond Member Since 2023

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Number of Employees
13
Year of Establishment
2011-01-24